This project consists of the buildout of a new Hybrid Operating Room located on the third floor within an existing Cath Lab Suite. The project required the onsite fabrication of a new structural steel beam in order to remove an existing structural concrete column. The project includes new radiation protection, structural steel supports for new equipment and new mechanical, plumbing and electrical systems.